Rig workers prepare to lower the bit, which is affixed to the bottom hole assembly. For this well, contracted by Laredo Petroleum, they're drilling straight down 7,038 feet; then making a 90-degree turn and drilling horizontally another 7,387 feet.
Rig workers prepare to lower the bit, which is affixed to the bottom hole assembly. For this well, contracted by Laredo Petroleum, they're drilling straight down 7,038 feet; then making a 90-degree turn and drilling horizontally another 7,387 feet.